Excavated defective overhead sewer and installed new 4″ PVC overhead sewer with 4″ PVC clean out Team Kuware on October 4, 2024
Excavated 6-8 feet in front yard to install new overhead sewer through front yard with new clean out station Team Kuware on October 4, 2024
Excavated overhead sewer through foundation wall and approximately 8 feet on exterior; installed new 4″ PVC overhead sewer Team Kuware on October 4, 2024
Installed 75 feet of new 4″ perforated PVC with nylon sleeve in basement interior perimeter and two new window well drains Team Kuware on October 4, 2024
Excavated 6 feet of clay tile along with wye connection for private sewer and installed 6 feet of new PVC main with new PVC wye connection Team Kuware on October 4, 2024
Excavated 40 feet of main sewer in city right of way and installed 40 feet of new 6″ PVC sewer connecting to city main Team Kuware on October 4, 2024
Excavated and installed new flood control system with new 48″ x 84″ concrete structure w/Zoeller ejector pump Team Kuware on October 4, 2024
Excavated and installed 10 feet of new 4″ PVC storm sewer, connecting to common line for community. Team Kuware on October 4, 2024
Installed new clay ejector crock in flood control with new Zoeller 2″ ejector pump and appropriate pipework Team Kuware on October 4, 2024