Power rod and video inspected sewer line from cleanout in basement. Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Excavated and installed new flood control system with new 48″ x 84″ concrete structure w/Zoeller ejector pumpNext: Next post: Excavated 40 feet of main sewer in city right of way and installed 40 feet of new 6″ PVC sewer connecting to city main