Excavated 40 feet of main sewer in city right of way and installed 40 feet of new 6″ PVC sewer connecting to city main Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Power rod and video inspected sewer line from cleanout in basement.Next: Next post: Excavated 6 feet of clay tile along with wye connection for private sewer and installed 6 feet of new PVC main with new PVC wye connection