Excavated and installed new flood control system with new 48″ x 84″ concrete structure w/Zoeller ejector pump Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Excavated and installed 10 feet of new 4″ PVC storm sewer, connecting to common line for community.Next: Next post: Power rod and video inspected sewer line from cleanout in basement.