Installed new clay ejector crock in flood control with new Zoeller 2″ ejector pump and appropriate pipework Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Inspected gas line ; line loose at stoveNext: Next post: Excavated and installed 10 feet of new 4″ PVC storm sewer, connecting to common line for community.