Excavated 6-8 feet in front yard to install new overhead sewer through front yard with new clean out station Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Excavated overhead sewer through foundation wall and approximately 8 feet on exterior; installed new 4″ PVC overhead sewer Next: Next post: Excavated defective overhead sewer and installed new 4″ PVC overhead sewer with 4″ PVC clean out