Excavated defective overhead sewer and installed new 4″ PVC overhead sewer with 4″ PVC clean out Team Kuware on October 4, 2024 Post navigation Previous: Previous post: Excavated 6-8 feet in front yard to install new overhead sewer through front yard with new clean out stationNext: Next post: Installed new Rheem 40 gallon natural gas standard vent water heater