Excavated and installed 40 feet of new 6″ PVC sewer connecting to existing 6″ clay tile with new 6″ PVC clean out Team Kuware on May 30, 2024
Re-piped first floor bathroom drain lines with new PVC pipe connecting to existing vertical drain/vents Team Kuware on May 30, 2024
Installed new 18″x30″ poly sump pump pit and re-connect existing incoming pipes. Installed customer provided Zoeller Pro-Pak pump system Team Kuware on May 30, 2024
Augered toilet in 2nd floor bathroom; power rod and televised main sewer via flood control in yard Team Kuware on May 30, 2024