Augered toilet in 2nd floor bathroom; power rod and televised main sewer via flood control in yard Team Kuware on May 30, 2024 Post navigation Previous: Previous post: Excavated and installed new ejector pit with Zoeller ejector pumpNext: Next post: Installed new 18″x30″ poly sump pump pit and re-connect existing incoming pipes. Installed customer provided Zoeller Pro-Pak pump system