Re-piped first floor bathroom drain lines with new PVC pipe connecting to existing vertical drain/vents Team Kuware on May 30, 2024 Post navigation Previous: Previous post: Power rod bathroom sink in second floor bathroomNext: Next post: Excavated and installed 40 feet of new 6″ PVC sewer connecting to existing 6″ clay tile with new 6″ PVC clean out