Installed new overhead sewer with 4 to 6 feet of new 4″ PVC pipe connecting to existing sewer in basement Team Kuware on October 15, 2024
Excavated and installed approximately 125 feet of new 4″ PVC sewer with two new 4″ PVC clean out stations Team Kuware on October 15, 2024
Excavate to main sewer line at existing defective clean out and installed new 6″ PVC two way cleanout Team Kuware on October 15, 2024