Excavate to main sewer line at existing defective clean out and installed new 6″ PVC two way cleanout Team Kuware on October 15, 2024 Post navigation Previous: Previous post: Hydro jet from old downspouts on west side of barnNext: Next post: Excavated and installed approximately 125 feet of new 4″ PVC sewer with two new 4″ PVC clean out stations