Power rod main sewer from basement access and video inspected Team Kuware on October 15, 2024 Post navigation Previous: Previous post: Excavated and installed approximately 125 feet of new 4″ PVC sewer with two new 4″ PVC clean out stationsNext: Next post: Power rod sewer from basement stack