Excavated 40 feet of defective 6″ clay sewer and installed 40 feet of new 6″ PVC from existing PVC clean out in yard to city main in roadway Team Kuware on October 17, 2024
Excavated to install approximately 20 feet of new 6″ PVC sewer to city sidewalk in front yard, connecting to 6″ PVC clean out Team Kuware on October 17, 2024
Installed new Richmond 50 gallon natural gas standard vent water heater, Team Kuware on October 17, 2024
Installed new Rheem 40 gallon natural gas standard vent water heater with approximately one foot of new copper line. Team Kuware on October 17, 2024
Cleared blockage from tub drain; disassembled and re-assembled drain pop-up to access Team Kuware on October 17, 2024