Cleared blockage from tub drain; disassembled and re-assembled drain pop-up to access Team Kuware on October 17, 2024 Post navigation Previous: Previous post: Installed Richmond 40 gallon power vent water heaterNext: Next post: Installed new Rheem 40 gallon natural gas standard vent water heater with approximately one foot of new copper line.