Removed defective and installed new 1-1/4″ grinder pump; pumped out lift station of waste water debris Team Kuware on October 21, 2024
Remove defective and install new sanitary roundway in yard connecting to existing discharge Team Kuware on October 21, 2024
Removed 6-8 feet of defective 3″ & 4″ cast iron main stack and replace with 3″ & 4″ new PVC Team Kuware on October 21, 2024
Installed new 1-1/2″ air admittance valve on shower drain with 6 feet of pipe Team Kuware on October 21, 2024