Installed 7 feet of new 1-1/2″ PVC with new 1-1/2″ PVC p-trap connecting to existing waste and overflow Team Kuware on October 2, 2024
Removed existing 50 gallon water heater to install new tank less water heater Team Kuware on October 2, 2024
Installed Zoeller Pro Pak system including primary pump, back up pump, and control/diagnostic box Team Kuware on October 2, 2024