Excavated 8 feet of main sewer and installed 8 feet of new 6″ PVC sewer with new 6″ PVC clean out Team Kuware on August 29, 2024
Installed new hose bib with new 1/2″ shut off valve and 18 feet of new 1/2″ copper Team Kuware on August 29, 2024
Installed new Zoeller sump pump with 5 feet of new 1 1/2″ PVC pipe and new 1 1/2″ check combo valve Team Kuware on August 29, 2024
Excavated & installed 150 feet of new 4″ perferoted PVC drain tile in interior perimeter of basement Team Kuware on August 29, 2024
Excavated 10 feet of defective main sewer at city main under brick pavers in city street to install approximately 10 feet of new PVC sewer Team Kuware on August 29, 2024
Performed pressure test on gas pipe via 1″ main gas feed on house side after meter Team Kuware on August 29, 2024
Excavate and installed 5 feet of new 4″ PVC sewer with clean out station Team Kuware on August 29, 2024
Installed new Zoeller pro pak battery back-up sump pump system with new Zoeller maintenance free aquanot battery Team Kuware on August 29, 2024