Excavate basement floor and removed flood control. Installed 15′ of new 6″ PVC connecting to existing underground clay tile sewer in basement and front yard Team Kuware on May 27, 2024
Installed new flood control system with 2-6″ cast iron check valves and new 4″ PVC stairwell drain connecting to existing drain tile Team Kuware on May 27, 2024