Replaced 2 feet of defective sump pump discharge line to drain Team Kuware on August 29, 2024 Post navigation Previous: Previous post: Excavated main sewer line in front yard to install 6″ PVC clean out accessNext: Next post: Installed new p-trap and tailpiece on laundry tub, new fill valve& flapper on master toilet, and water spigot in front of building