Installed new ejector pump and 3 feet of new 2″ PVC pipe Team Kuware on October 14, 2024 Post navigation Previous: Previous post: Extended storm sewer in front yard 10 feet with new PVC 4″ pop-up drain and connected to existing 4″ PVCNext: Next post: Excavated to install 25 feet of new 6″ PVC sewer with new 6″ PVC clean out,