Hydro jet and descaled building sewer Team Kuware on October 7, 2024 Post navigation Previous: Previous post: Excavated defective sewer line and installed 10 feet of PVC sewerNext: Next post: Installed 3 feet of new 1-1/2″ PVC under sink with new 1-1/2″ clean out and two new 1-1/2″ ptraps under sink