Excavated to install 20 feet of new 4″ PVC sewer with new 4″ PVC clean out Team Kuware on October 7, 2024 Post navigation Previous: Previous post: Removed defective water softner and installed 4 feet of new copper water feeds with new 3/4″ ball valvesNext: Next post: Installed new hose bib