Excavated overhead sewer under sidewalk and installed new overhead sewer through foundation wall Team Kuware on October 14, 2024 Post navigation Previous: Previous post: Power rod and televised main sewer line from inside clean outNext: Next post: Installed new Rheem 40 gallon natural gas standard vent water heater