Excavated main sewer line in front yard to remove 6 feet of clay sewer and replaced with PVC & installed 6″ PVC clean out station Team Kuware on July 23, 2024 Post navigation Previous: Previous post: Removed section of defective clay sewer and replaced with 6-8 feet of PVC with clean out stationNext: Next post: Excavated and installed new 6″ PVC check valve, new PVC wye connection, and 8 feet of new 6″ PVC sewer with new 6″ PVC clean out station