Excavated and replaced 8 feet of sewer in parkway with new 6″ PVC sewer Team Kuware on October 7, 2024 Post navigation Previous: Previous post: Excavated 120 feet of defective sewer from house to city main; installed 120 feet of new 6″ PVC sewer with 2 new clean outsNext: Next post: Re-piped about 3 feet of hot and cold water lines to water heater