Removed defective and installed new 1-1/4″ grinder pump; pumped out lift station of waste water debris Team Kuware on October 21, 2024 Post navigation Previous: Previous post: Remove defective and install new sanitary roundway in yard connecting to existing dischargeNext: Next post: Installed new Rheem 40 gallon standard vent water heater