Replaced and installed two customer supplied toilets Team Kuware on May 27, 2024 Post navigation Previous: Previous post: Excavate basement floor and removed flood control. Installed 15′ of new 6″ PVC connecting to existing underground clay tile sewer in basement and front yardNext: Next post: Installed new 40-gallon Power Vent water heater